top of page
Search

Work to the bell tower

  • NHG
  • Jun 22
  • 1 min read
Taken 23-05-25 recording condition at base of Steelwork posts supporting roof over bell carriage area following removal of in situ concrete with top end of metal straps which extend down through Bell tower evident.
Taken 23-05-25 recording condition at base of Steelwork posts supporting roof over bell carriage area following removal of in situ concrete with top end of metal straps which extend down through Bell tower evident.

 
 
 

Comments


©2035 by Newtownstewart Heritage Group.

    bottom of page