top of page
Search

Concrete removed from the belltower

  • NHG
  • Jun 22
  • 1 min read
Taken 23-05-25 recording condition at base of steelwork posts supporting roof over bell carriage area following removal of in situ concrete. Lot of corrosion evident on face of steelwork flanges.
Taken 23-05-25 recording condition at base of steelwork posts supporting roof over bell carriage area following removal of in situ concrete. Lot of corrosion evident on face of steelwork flanges.

 
 
 

Comments


©2035 by Newtownstewart Heritage Group.

    bottom of page